Küçüksu Basin Üsküdar District 2001 Wastewater Sewer Construction

Küçüksu Basin Üsküdar District 2001 Wastewater Sewer Construction

PROJECT INFORMATION

PROJECT COMPLETION STATUS

%100

Project Location İstanbul/Türkiye
Project Type Wastewater Sewer Construction
Start Date 2002-07-19
Completion Date 2005-05-08

Küçüksu Basin Wastewater Sewer Construction – Üsküdar, Ümraniye, and Beykoz Districts

As part of this project, which covers the Üsküdar, Ümraniye, and Beykoz districts within the Küçüksu basin, a total of 109,802 meters of wastewater and stormwater pipelines have been constructed. The installed pipe diameters and lengths are as follows:

  • Ø 200 mm → 37,059 meters Ø 300 mm → 61,892 meters Ø 400 mm → 4,918 meters Ø 500 mm → 2,438 meters Ø 600 mm → 1,989 meters Ø 800 mm → 397 meters Ø 900 mm → 59 meters Ø 1000 mm → 144 meters Ø 1200 mm → 210 meters Ø 1400 mm → 491 meters Ø 1600 mm → 631 meters